- PREPARATION
Wash floor thoroughly, acid etch floor with Hydrochloric Acid, Rinse Well.
Ensure floor is fully dry prior to painting.
- FINISHING COATS
Apply Finishing Coats: 2 coats Versus Floor Paint (VFP).
- See table below for approximate dying times and spread rates
SYSTEM |
APPLICATION |
CONCRETE FLOORS |
PRODUCT REFERENCE CODE |
RECOATING TIME / DRYING TIME AT 23°C |
SPREADING RATE M² per liter |
Preparation | Brush, roller, spray | Wash floor thoroughly.
Acid etch floor with Hydrochloric Acid. Rinse Well. Ensure that all surfaces are clean, dry and sound. Refer to Surface Preparation |
|
12 hours
|
8-10
|
First Coat | Brush, roller, spray | Apply first coat Versus Floor Paint (VFP) |
VFP
|
12 hours
|
8-10
|
2nd Coat | Brush, roller, spray | Application of 2nd coat of Versus Floor Paint (VFP) |
VFP |
12 hours |
8-10 |