[MWB_PDF_GEN]
- PREPARATION
The bare metal areas (nail / screw heads) should be primed with Versus Steel Primer and filled with Versa-Fill.
There after boards to be primed with Apply 1 coat Versus Bonding Liquid (VBL)
- FINISHING COATS
Apply 2 coats of Versus Premium Range or 2 coats with Versus Economy Range
- VERSUS PREMIUM RANGE
Apply Finishing Coats: 2 coats Versus Status Low Sheen (VSLS) or Versus Status Matt (VSM)
Or
- VERSUS ECONOMY RANGE
Apply Finishing Coats: 2 coats Versus Alta Marea Super Acrylic Mid Sheen (VSAMS ) or Versus Alta Marea Super Acrylic Matt (VSAMM)
- See table below for approximate dying times and spread rates
SYSTEM |
APPLICATION |
FIBRE CEMENT BOARDS |
PRODUCT REFERENCE CODE |
RECOATING TIME / DRYING TIME AT 23°C |
SPREADING RATE M² per liter |
Preparation | Ensure that all surfaces are clean, dry and sound.
Refer to Surface Preparation |
||||
Primer Coat | Brush, roller, spray | Application of one coat Versus Bonding Liquid | VBL
|
4 hours
|
8-10
|
First Coat | Brush, roller, spray | VERSUS PREMIUM RANGE
Apply first coat of Versus Status Low Sheen (VSLS) or Versus Status Matt (VSM) Or VERSUS ECONOMY RANGE Apply Finishing Coats: 2 coats Versus Alta Marea Super Acrylic Mid Sheen (VSAMS ) or Versus Alta Marea Super Acrylic Matt (VSAMM)
|
VSLS,VSM,
VSAMS, VSAMM |
4 hours
|
8-10
|
2nd Coat | Brush, roller, spray | Application of 2nd coat of either
VERSUS PREMIUM RANGE/ VERSUS ECONOMY RANGE |
4 hours | 8-10 | |
Brush, Roller, Trowel,
Hopper Gun |
*EXCLUSIVE WALL COATING: (No re-coating required, only drying time).
** Consumption is dependent on the coating chosen. |
*12 Hours | 1.5Kg – 5Kg / M2** |