- PREPARATION
Apply 1 coat Versus Plaster Primer (VPP) or Versus Masonry Primer (VMP)
Apply 2 coats Versus Versaproof (Smooth) add Membrane or apply 2 coats Versaproof (with fibre), using a ripple roller.
- FINISHING COATS
Apply Finishing Coats: 2 coats Versus Sure Wall (VSW) or Versus Status Low Sheen (VSLS) or Versus Status Matt (VSM)
See table below for approximate dying times and spread rates
SYSTEM |
APPLICATION |
PARAPET WALLS |
PRODUCT REFERENCE CODE |
RECOATING TIME / DRYING TIME AT 23°C |
SPREADING RATE M² per liter |
Preparation | Brush, roller, spray | Ensure that all surfaces are clean, dry and sound.
Refer to Surface Preparation Allow 12 Hours to dry. APPLY 1 coat Versus Plaster Primer (VPP) or Versus Masonry Primer (VMP)
|
VPP VMP
|
12 hours
|
8-10
|
First Coat | Brush, roller, spray | Apply first coat Versus Versaproof (Smooth) (VVPS) and add Membrane or apply 1 coat Versaproof (with fibre), (VVPF) using a ripple roller. |
VVPS VVPF
|
4 hours |
8-10 |
2nd Coat | Brush, roller, spray | Application of 2nd coat of Versaproof (VVPS) or Versaproof (with fibre), (VVPF) |
VVPS VVPF |
4 hours
|
8-10 |