- SURFACE PREPARATION
Ensure that all surfaces are clean, dry and sound.
Concrete must cure for a minimum of 28 days.
Remove any residual oil with Versus Degreaser. This can be brushed on.
Leave for 30 Min to react, rinse thoroughly with fresh water.
High pressure rinsing is optional (if possible).
Allow to dry completely.
Algae can be removing by using 1:3 parts (1 part Sodium Hypochlorite: 3 part Water)
Leave for 30 Min react, rinse thoroughly with fresh water. High pressure rinsing is optional (if possible).
Allow to dry completely.
Fill all cracks / Blemishes with Versus Vera-fill
Apply 1 coat Versus Plaster Primer (VPP) or Versus Masonry Primer (VMP)
Allow to dry completely (12 Hours).
- FINISHING COATS
Apply 2 coats of Versus Premium Range or 2 coats with Versus Economy Range
- VERSUS PREMIUM RANGE
Apply Finishing Coats: 2 coats Versus Sure Wall (VSW) or Versus Status Low Sheen (VSLS) or Versus Status Matt (VSM)
Or
- VERSUS ECONOMY RANGE
Apply Finishing Coats: 2 coats Versus Alta Marea Super Acrylic Mid Sheen (VSAMS ) or Versus Alta Marea Super Acrylic Matt (VSAMM)
SYSTEM |
APPLICATION |
WALL SURFACES – EXTERNAL (PLASTER & CONCRETE) |
PRODUCT REFERENCE CODE |
RECOATING TIME / DRYING TIME AT 23°C |
SPREADING RATE M² per liter |
Preparation | Ensure that all surfaces are clean, dry and sound.
Refer to Surface Preparation |
||||
Primer Coat | Brush, roller, spray | Application of one coat Versus Plaster Primer, or
Application of one coat Versus Water Based Bonding Liquid |
VPP
VWBL
|
12 hours
4 hours
|
8-10
8-10 |
First Coat | Brush, roller, spray | VERSUS PREMIUM RANGE
Apply first coat of Versus Status Low Sheen (VSLS) or Versus Status Matt (VSM) or Versus Anti-Bacterial (VSAB) or Versus Anti Mosquito (VSAM) or Versus Eco Bebe (VSEB) Or VERSUS ECONOMY RANGE Apply Finishing Coats: 2 coats Versus Alta Marea Super Acrylic Mid Sheen (VSAMS ) or Versus Alta Marea Super Acrylic Matt (VSAMM)
Application of 1st Coat VERSUS PREMIUM / ECONOMY PAINT |
VSLS,VSM,VSAB, VSAM,VSEB
VSAMS, VSAMM |
4 hours
|
8-10
|
2nd Coat | Brush, roller, spray | Application of 2nd coat of either
VERSUS PREMIUM RANGE/ VERSUS ECONOMY RANGE |
4 hours
|
8-10 | |
Brush, Roller, Trowel,
Hopper Gun |
*EXCLUSIVE WALL COATING: (No re-coating required, only drying time).
** Consumption is dependent on the coating chosen. |
*12 Hours | 1.5Kg – 5Kg / M2** |